Presidential Palace

Surespan, a leader in the design and manufacture of high-quality access solutions, played a pivotal role in the development of Qaṣr Al-Waṭan, the prestigious Presidential Palace in Abu Dhabi, United Arab Emirates.

Our involvement in this monumental project involved the production and supply of an array of access hatches, tailored to meet the specific needs of this iconic structure.

In total, Surespan supplied over 86 distinct access solutions for the palace. Among these were our Hydraulic HIAC covers, renowned for their robust design and efficient operation.

These covers, primarily measuring 5 feet 10 inches, were engineered to withstand FACTA Class ‘B’ vehicle loading, making them an ideal choice for areas subject to heavy traffic. Their operation was facilitated by hand pumps, acting on hydraulic cylinders, ensuring ease of use and reliability.

Additionally, the project required a significant number of stainless steel covers, with more than 70 crafted to fit dimensions of 4 feet with recesses of 1 inch and 3 inches.

These were designed to blend seamlessly with the palace’s aesthetics, featuring gas spring assistance and a polished stainless steel top trim for the internal HIAC covers, which measured 1 foot 11 inches by 1 foot 11 inches. The recesses allowed for the incorporation of marble, adding to the luxury finishes of the palace’s interior.

Surespan also supplied stainless steel Roof Hatches, in dimensions of 2 feet 7 inches by 2 feet 11 inches and 1 foot 11 inches by 1 foot 11 inches. These hatches were not only aesthetically pleasing but also functional, being fire-rated for up to two hours. The finishes included a powder coating in RAL 9010, providing durability and complementing the palace’s sophisticated design palette.

This project exemplifies Surespan’s commitment to excellence and our ability to meet the stringent requirements of a high-profile development such as Qaṣr Al-Waṭan. Our bespoke solutions, designed with precision and built to last, underscore our position as a leading supplier in the access products industry.

This case study demonstrates our capability to tackle challenges and deliver products that combine aesthetics, functionality, and safety, contributing to the grandeur and security of the Presidential Palace.

South Clyde Energy Centre

Surespan supplied a bespoke hydraulically operated double-leaf access cover package for the South Clyde Energy Centre, a major Energy-from-Waste facility under construction in Glasgow.

Centenario Ratones Lithium Plant

Project snapshot Project: Centenario Ratones Lithium Production Plant Location: Salar Centenario Ratones, Department of Los Andes, Salta Province, Argentina (3,800m above sea level) Client: Eramine Sudamérica S.A. (subsidiary of Eramet Group, France / Tsingshan, China) Delivery model: Direct supply, Ex Works. Client arranged logistics to Argentina. Scope: 2no. SRHE/50/DL electrically operated double-leaf roof access hatches (5000 x 5500mm structural opening), with electrical control boxes, battery back-up, key switch controls, painted finish, removable lifting eyes, spare actuators, and 5 days supervisory installation attendance. The project The Centenario Ratones plant is one of the most significant lithium projects in South America. Operated by Eramine Sudamérica S.A. — a joint venture between French mining group Eramet (50.1%) and Chinese steelmaker Tsingshan (49.9%) — the plant uses advanced Direct Lithium Extraction (DLE) technology to produce 24,000 tonnes of battery-grade lithium carbonate per year from brine pumped from beneath the salt flat. Representing an investment
Explore
Drag