Ferrari World

The park has been open since 2010 and has been nominated for numerous awards.

Ferrari World in Abu Dhabi is the world’s first Ferrari theme park. The park includes 37 different rides and attractions and features the world’s fastest rollercoaster “Formula Rossa” – reaching 240 km/h in 4.9 seconds.

The architectural team behind Ferrari World, seeking solutions for the intricate maintenance requirements of the Formula Rossa rollercoaster, reached out to Surespan. The project demanded innovative access solutions to facilitate easy and efficient maintenance of the rollercoaster carts within the confined spaces of the park.

Our response was the provision of the SLHP sliding roof hatch, meticulously designed to meet the specific requirements of this challenging environment. The SLHP hatch, measuring 18′-3″ x 13′-2″ for the structural opening, features a lid designed to slide across the width on runners positioned on the roof.

This design choice was pivotal for ensuring that maintenance crews could gain unobstructed access to the rollercoaster carts, thereby streamlining the maintenance process and minimising downtime for this critical attraction.

Operated by a 230v geared motor, the SLHP hatch combines ease of use with robust performance. The lid and upstand are infused with 1″ thick CFC and HCFC free polyisocyanurate insulation, achieving a U-Value of 0.43 W/m^2K. This not only ensures operational efficiency but also contributes to the sustainability objectives of the project by minimising energy loss.

The hatch was engineered to seamlessly integrate with the existing infrastructure, sitting on an existing upstand, thus avoiding the need for extensive modifications to the park’s structure. This design consideration was critical in meeting the project’s timelines and budget constraints, demonstrating Surespan’s commitment to delivering tailored, efficient solutions.

South Clyde Energy Centre

Surespan supplied a bespoke hydraulically operated double-leaf access cover package for the South Clyde Energy Centre, a major Energy-from-Waste facility under construction in Glasgow.

Centenario Ratones Lithium Plant

Project snapshot Project: Centenario Ratones Lithium Production Plant Location: Salar Centenario Ratones, Department of Los Andes, Salta Province, Argentina (3,800m above sea level) Client: Eramine Sudamérica S.A. (subsidiary of Eramet Group, France / Tsingshan, China) Delivery model: Direct supply, Ex Works. Client arranged logistics to Argentina. Scope: 2no. SRHE/50/DL electrically operated double-leaf roof access hatches (5000 x 5500mm structural opening), with electrical control boxes, battery back-up, key switch controls, painted finish, removable lifting eyes, spare actuators, and 5 days supervisory installation attendance. The project The Centenario Ratones plant is one of the most significant lithium projects in South America. Operated by Eramine Sudamérica S.A. — a joint venture between French mining group Eramet (50.1%) and Chinese steelmaker Tsingshan (49.9%) — the plant uses advanced Direct Lithium Extraction (DLE) technology to produce 24,000 tonnes of battery-grade lithium carbonate per year from brine pumped from beneath the salt flat. Representing an investment
Explore
Drag