Liffey Service Tunnel, Ireland

Ireland-liffey-Service-floor-hatch

Surespan supplied a number of floor access covers for the Liffey Service Tunnel project in Dublin, Ireland. The €6.5 million project consists of a 260m long, 3m external diameter tunnel traversing under the river Liffey near Ringsend in Dublin

Liffey-Service-Tunnel
Ireland-liffey-Service-floor-hatch
Ireland-Liffey-Service-floor
Ireland-Liffey-Service

Recessed Access Covers

SAC Flush Floor Access Covers

  • 900 x 900 (35″ x 35″)
  • 700 x 600 (27″ x 23″)
  • 900 x 700 (35″ x 27″) Single Leaf
  • 900 x 700 (35″ x 27″) Double Leaf
  • 1000 x 600 (39″ x 23″)
  • 3000 x 1000 (118″ x 39″) Triple Leaf

HIAC Recessed Floor Covers

  • 3150 x 1050 100mm Infill D400 Hydraulic operation
  • 3150 x 1050 100mm Infill

All the access covers were supplied with either a gas spring assisted opening, hydraulic of electric with a retractable safety grid and pedestrian (FACTA Class ‘A’) Loading. A hydraulic HIAC was also supplied with a FACTA Class ‘D’ Loading which is the equivalent of a 11 tonne wheel load.

Related Products