{"id":50036,"date":"2026-06-29T09:45:00","date_gmt":"2026-06-29T08:45:00","guid":{"rendered":"https:\/\/surespancovers.com\/us\/how-to-measure-retractable-ladder\/"},"modified":"2026-06-29T09:45:00","modified_gmt":"2026-06-29T08:45:00","slug":"how-to-measure-retractable-ladder","status":"publish","type":"post","link":"https:\/\/surespancovers.com\/us\/how-to-measure-retractable-ladder\/","title":{"rendered":"How to Specify a Retractable Ladder: Measurements, Openings and Mistakes"},"content":{"rendered":"<p>To measure for a commercial retractable ladder, often called an attic ladder in the US, you need four things: the floor to ceiling height measured to the structure, the length and width of the structural (rough) opening, the depth of the void above the ceiling, and the floor space the ladder swings into when it is pulled down. On Surespan&#8217;s ZIP8, the floor to ceiling height sets the length of the structural opening, so that is the first figure to get right.<\/p>\n<p>This guide is for contractors and architects coordinating ceiling and roof access in commercial buildings, not for attic ladders in homes.<\/p>\n<h2>Which ZIP ladder are you specifying?<\/h2>\n<p>ZIP is the name of Surespan&#8217;s range of commercial retractable ladders. Some people use &#8220;ZIP ladder&#8221; for any folding ladder, so name the model in your inquiry:<\/p>\n<table class=\"mtr-table mtr-thead-th\">\n<thead>\n<tr>\n<th data-mtr-content=\"Model\" class=\"mtr-th-tag\"><div class=\"mtr-cell-content\">Model<\/div><\/th>\n<th data-mtr-content=\"How it is specified\" class=\"mtr-th-tag\"><div class=\"mtr-cell-content\">How it is specified<\/div><\/th>\n<th data-mtr-content=\"What to confirm early\" class=\"mtr-th-tag\"><div class=\"mtr-cell-content\">What to confirm early<\/div><\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td data-mtr-content=\"Model\" class=\"mtr-td-tag\"><div class=\"mtr-cell-content\"><a href=\"https:\/\/surespancovers.com\/us\/product\/zip-retractable-ladders\/\">ZIP 4 to ZIP 7<\/a><\/div><\/td>\n<td data-mtr-content=\"How it is specified\" class=\"mtr-td-tag\"><div class=\"mtr-cell-content\">Ladder first, then coordinated with the opening and any hatch or lining detail.<\/div><\/td>\n<td data-mtr-content=\"What to confirm early\" class=\"mtr-td-tag\"><div class=\"mtr-cell-content\">Whether you need a separate access hatch or lining, and the structural and clear openings the access route needs.<\/div><\/td>\n<\/tr>\n<tr>\n<td data-mtr-content=\"Model\" class=\"mtr-td-tag\"><div class=\"mtr-cell-content\"><a href=\"https:\/\/surespancovers.com\/us\/product\/zip8-retractable-ladders\/\">ZIP8<\/a><\/div><\/td>\n<td data-mtr-content=\"How it is specified\" class=\"mtr-td-tag\"><div class=\"mtr-cell-content\">Made to order and supplied as a complete unit with casing and trap door.<\/div><\/td>\n<td data-mtr-content=\"What to confirm early\" class=\"mtr-td-tag\"><div class=\"mtr-cell-content\">Structural opening, floor to ceiling height, void depth, and any backboard, handrail or operating options.<\/div><\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<h2>What do you need to measure?<\/h2>\n<table class=\"mtr-table mtr-thead-th\">\n<thead>\n<tr>\n<th data-mtr-content=\"Measurement\" class=\"mtr-th-tag\"><div class=\"mtr-cell-content\">Measurement<\/div><\/th>\n<th data-mtr-content=\"What it is\" class=\"mtr-th-tag\"><div class=\"mtr-cell-content\">What it is<\/div><\/th>\n<th data-mtr-content=\"Common mistake\" class=\"mtr-th-tag\"><div class=\"mtr-cell-content\">Common mistake<\/div><\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td data-mtr-content=\"Measurement\" class=\"mtr-td-tag\"><div class=\"mtr-cell-content\">Structural opening length<\/div><\/td>\n<td data-mtr-content=\"What it is\" class=\"mtr-td-tag\"><div class=\"mtr-cell-content\">The length of the opening formed in the structure, used to size the unit. A minimum applies.<\/div><\/td>\n<td data-mtr-content=\"Common mistake\" class=\"mtr-td-tag\"><div class=\"mtr-cell-content\">Giving the lid size, or an \u201copening\u201d with no label.<\/div><\/td>\n<\/tr>\n<tr>\n<td data-mtr-content=\"Measurement\" class=\"mtr-td-tag\"><div class=\"mtr-cell-content\">Structural opening width<\/div><\/td>\n<td data-mtr-content=\"What it is\" class=\"mtr-td-tag\"><div class=\"mtr-cell-content\">The width of the opening formed in the structure. A minimum applies.<\/div><\/td>\n<td data-mtr-content=\"Common mistake\" class=\"mtr-td-tag\"><div class=\"mtr-cell-content\">Mixing up the structural opening and the clear opening.<\/div><\/td>\n<\/tr>\n<tr>\n<td data-mtr-content=\"Measurement\" class=\"mtr-td-tag\"><div class=\"mtr-cell-content\">Floor to ceiling height<\/div><\/td>\n<td data-mtr-content=\"What it is\" class=\"mtr-td-tag\"><div class=\"mtr-cell-content\">The height range the ladder is made for. State the datum you measured from and to.<\/div><\/td>\n<td data-mtr-content=\"Common mistake\" class=\"mtr-td-tag\"><div class=\"mtr-cell-content\">Measuring to the suspended ceiling tiles instead of the structure above.<\/div><\/td>\n<\/tr>\n<tr>\n<td data-mtr-content=\"Measurement\" class=\"mtr-td-tag\"><div class=\"mtr-cell-content\">Void depth<\/div><\/td>\n<td data-mtr-content=\"What it is\" class=\"mtr-td-tag\"><div class=\"mtr-cell-content\">The depth available above the ceiling line, with any obstructions.<\/div><\/td>\n<td data-mtr-content=\"Common mistake\" class=\"mtr-td-tag\"><div class=\"mtr-cell-content\">Finding duct or pipe clashes after installation has started.<\/div><\/td>\n<\/tr>\n<tr>\n<td data-mtr-content=\"Measurement\" class=\"mtr-td-tag\"><div class=\"mtr-cell-content\">Casing height<\/div><\/td>\n<td data-mtr-content=\"What it is\" class=\"mtr-td-tag\"><div class=\"mtr-cell-content\">The height of the ladder\u2019s casing. Confirm it if your ceiling build-up is not standard.<\/div><\/td>\n<td data-mtr-content=\"Common mistake\" class=\"mtr-td-tag\"><div class=\"mtr-cell-content\">Not checking how the casing meets the ceiling build-up.<\/div><\/td>\n<\/tr>\n<tr>\n<td data-mtr-content=\"Measurement\" class=\"mtr-td-tag\"><div class=\"mtr-cell-content\">Backboard (optional)<\/div><\/td>\n<td data-mtr-content=\"What it is\" class=\"mtr-td-tag\"><div class=\"mtr-cell-content\">Height and width of an optional backboard for fixing and finishing.<\/div><\/td>\n<td data-mtr-content=\"Common mistake\" class=\"mtr-td-tag\"><div class=\"mtr-cell-content\">Leaving the backboard until late, when it clashes with the hatch or finishes.<\/div><\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p>For ZIP8, allow for the casing being made slightly smaller than the structural opening. That is normal and gives installation tolerance.<\/p>\n<h2>Structural opening, clear opening or &#8220;trap&#8221;?<\/h2>\n<p>Three words get used for the same hole, and they are not the same:<\/p>\n<ul>\n<li><strong>Structural opening<\/strong>: the opening formed in the structure by the builder, close to what US framers call the rough opening.<\/li>\n<li><strong>Clear opening<\/strong>: the usable size you can pass through once the frame and linings are in.<\/li>\n<li><strong>&#8220;Trap&#8221;<\/strong>: an informal word that can mean the lid, the lining or the hole. Avoid it on drawings.<\/li>\n<\/ul>\n<p>Label every dimension on the drawing as structural or clear.<\/p>\n<h2>How much floor space does the ladder need?<\/h2>\n<p>A retractable ladder swings down in an arc and lands some distance from the casing. The ZIP8 data sheet gives two figures for each band of floor to ceiling height: the touch down point, measured on the floor from the casing side, and the operating space, the arc the ladder swings through. The casing is 240mm (9.4 in) deep as standard.<\/p>\n<table class=\"mtr-table mtr-thead-th\">\n<thead>\n<tr>\n<th data-mtr-content=\"Floor to ceiling height, mm (in)\" class=\"mtr-th-tag\"><div class=\"mtr-cell-content\">Floor to ceiling height, mm (in)<\/div><\/th>\n<th data-mtr-content=\"Touch down point, mm (in)\" class=\"mtr-th-tag\"><div class=\"mtr-cell-content\">Touch down point, mm (in)<\/div><\/th>\n<th data-mtr-content=\"Operating space, mm (in)\" class=\"mtr-th-tag\"><div class=\"mtr-cell-content\">Operating space, mm (in)<\/div><\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td data-mtr-content=\"Floor to ceiling height, mm (in)\" class=\"mtr-td-tag\"><div class=\"mtr-cell-content\">2200 to 2500 (86.6 to 98.4)<\/div><\/td>\n<td data-mtr-content=\"Touch down point, mm (in)\" class=\"mtr-td-tag\"><div class=\"mtr-cell-content\">1350 to 1200 (53.1 to 47.2)<\/div><\/td>\n<td data-mtr-content=\"Operating space, mm (in)\" class=\"mtr-td-tag\"><div class=\"mtr-cell-content\">1450 (57.1)<\/div><\/td>\n<\/tr>\n<tr>\n<td data-mtr-content=\"Floor to ceiling height, mm (in)\" class=\"mtr-td-tag\"><div class=\"mtr-cell-content\">2500 to 2790 (98.4 to 109.8)<\/div><\/td>\n<td data-mtr-content=\"Touch down point, mm (in)\" class=\"mtr-td-tag\"><div class=\"mtr-cell-content\">1450 to 1300 (57.1 to 51.2)<\/div><\/td>\n<td data-mtr-content=\"Operating space, mm (in)\" class=\"mtr-td-tag\"><div class=\"mtr-cell-content\">1550 (61.0)<\/div><\/td>\n<\/tr>\n<tr>\n<td data-mtr-content=\"Floor to ceiling height, mm (in)\" class=\"mtr-td-tag\"><div class=\"mtr-cell-content\">2791 to 3090 (109.9 to 121.7)<\/div><\/td>\n<td data-mtr-content=\"Touch down point, mm (in)\" class=\"mtr-td-tag\"><div class=\"mtr-cell-content\">1550 to 1440 (61.0 to 56.7)<\/div><\/td>\n<td data-mtr-content=\"Operating space, mm (in)\" class=\"mtr-td-tag\"><div class=\"mtr-cell-content\">1650 (65.0)<\/div><\/td>\n<\/tr>\n<tr>\n<td data-mtr-content=\"Floor to ceiling height, mm (in)\" class=\"mtr-td-tag\"><div class=\"mtr-cell-content\">3091 to 3390 (121.7 to 133.5)<\/div><\/td>\n<td data-mtr-content=\"Touch down point, mm (in)\" class=\"mtr-td-tag\"><div class=\"mtr-cell-content\">1660 to 1540 (65.4 to 60.6)<\/div><\/td>\n<td data-mtr-content=\"Operating space, mm (in)\" class=\"mtr-td-tag\"><div class=\"mtr-cell-content\">1770 (69.7)<\/div><\/td>\n<\/tr>\n<tr>\n<td data-mtr-content=\"Floor to ceiling height, mm (in)\" class=\"mtr-td-tag\"><div class=\"mtr-cell-content\">3391 to 3690 (133.5 to 145.3)<\/div><\/td>\n<td data-mtr-content=\"Touch down point, mm (in)\" class=\"mtr-td-tag\"><div class=\"mtr-cell-content\">1770 to 1640 (69.7 to 64.6)<\/div><\/td>\n<td data-mtr-content=\"Operating space, mm (in)\" class=\"mtr-td-tag\"><div class=\"mtr-cell-content\">1890 (74.4)<\/div><\/td>\n<\/tr>\n<tr>\n<td data-mtr-content=\"Floor to ceiling height, mm (in)\" class=\"mtr-td-tag\"><div class=\"mtr-cell-content\">3691 to 3990 (145.3 to 157.1)<\/div><\/td>\n<td data-mtr-content=\"Touch down point, mm (in)\" class=\"mtr-td-tag\"><div class=\"mtr-cell-content\">1880 to 1740 (74.0 to 68.5)<\/div><\/td>\n<td data-mtr-content=\"Operating space, mm (in)\" class=\"mtr-td-tag\"><div class=\"mtr-cell-content\">2010 (79.1)<\/div><\/td>\n<\/tr>\n<tr>\n<td data-mtr-content=\"Floor to ceiling height, mm (in)\" class=\"mtr-td-tag\"><div class=\"mtr-cell-content\">3991 to 4300 (157.1 to 169.3)<\/div><\/td>\n<td data-mtr-content=\"Touch down point, mm (in)\" class=\"mtr-td-tag\"><div class=\"mtr-cell-content\">1980 to 1830 (78.0 to 72.0)<\/div><\/td>\n<td data-mtr-content=\"Operating space, mm (in)\" class=\"mtr-td-tag\"><div class=\"mtr-cell-content\">2030 (79.9)<\/div><\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p>Check the corridor width, door swings and anything else in that zone, so the ladder can come down and be climbed without creating a pinch point.<\/p>\n<h2>What about suspended ceilings?<\/h2>\n<p>Where there is a drop ceiling, give two heights: the finished ceiling line, for the trap door position and finishes, and the height to the structural soffit (the underside of the slab), for fixing. A retractable ladder is fixed to the structure above, never to a suspended ceiling grid. In a deep ceiling zone, plan the liner and finishing detail early.<\/p>\n<h2>How do you check the void above the ceiling?<\/h2>\n<p>Mark up the void depth and anything in it: ductwork, cable trays, pipework, sprinklers and lighting can clash with the casing or the path the ladder swings through. Check the structural depth at the opening as well. Where the slab is much thicker than the casing or lining, the opening may need an extension or lining to bridge the build-up.<\/p>\n<h2>What does the ZIP8 data sheet state?<\/h2>\n<ul>\n<li>Die cast aluminum alloy ladder with aluminum non-slip treads and an insulated wooden trapdoor.<\/li>\n<li>62mm (2.4 in) insulated sandwich trapdoor, underside finished in white.<\/li>\n<li>Timber surround 19mm (0.7 in) thick and 240mm (9.4 in) high.<\/li>\n<li>Standard tread 350mm by 140mm depth (13.8 by 5.5 in); other sizes on request.<\/li>\n<li>Loading 200kg per tread (approx. 441 lb).<\/li>\n<li>Counterbalanced springs in the pivot bracket; spring latch locked with an operating pole.<\/li>\n<li>One side telescopic handrail; bespoke sizes available.<\/li>\n<li>Certified to EN14975, the European standard for loft (attic) ladders.<\/li>\n<\/ul>\n<p>The ZIP 4 to ZIP 7 sheet gives a minimum aperture of 600 x 900\u00a0mm (23.6 x 35.4 in) for all four models and asks you to add 50mm (2.0 in) to the minimum aperture width to allow for the frame thickness of a ceiling door. It also says it is up to the customer to make sure the aperture is large enough. The models weigh 28kg (ZIP 4), 30kg (ZIP 5), 32kg (ZIP 6) and 34kg (ZIP 7), approx. 62, 66, 71 and 75 lb.<\/p>\n<h2>Is a retractable ladder the right choice?<\/h2>\n<p>A retractable ladder suits occasional access where the floor below must stay clear. It is not automatically right for frequent use or where people carry equipment. If the route is used regularly, or the swing zone is tight, a <a href=\"https:\/\/surespancovers.com\/us\/product\/fixed-vertical-ladders\/\">fixed vertical ladder<\/a> or a <a href=\"https:\/\/surespancovers.com\/us\/product\/companionway-ladders\/\">companionway ladder<\/a> may fit better.<\/p>\n<p>If the opening is in a fire-rated ceiling or floor, confirm early whether the hatch needs a fire rating. Fire performance comes from the hatch specification and the installation detail, so do not assume a ladder and hatch combination carries a rating.<\/p>\n<h2>Frequently asked questions<\/h2>\n<h3>What size opening does a commercial attic ladder need?<\/h3>\n<p>It depends on the model and the ceiling height. For ZIP 4 to ZIP 7 the minimum aperture is 600 x 900\u00a0mm (23.6 x 35.4 in). For ZIP8 the floor to ceiling height sets the length of the structural opening, so send the height first.<\/p>\n<h3>Do I measure to the ceiling tiles or the slab?<\/h3>\n<p>Both, where there is a suspended ceiling: the finished ceiling line and the structural soffit. The ladder fixes to the structure.<\/p>\n<h3>How far into the room does the ladder land?<\/h3>\n<p>On ZIP8, from 1350 to 1200\u00a0mm (53.1 to 47.2 in) for a 2200 to 2500\u00a0mm (86.6 to 98.4 in) floor to ceiling height, up to 1980 to 1830\u00a0mm (78.0 to 72.0 in) for 3991 to 4300\u00a0mm (157.1 to 169.3 in), measured on the floor from the casing side.<\/p>\n<h3>What should I send for a quote?<\/h3>\n<p>A marked-up drawing with the structural opening length and width, the floor to ceiling height and its datum, the void depth, whether the ceiling is suspended and the soffit height, any services in the way, the swing zone constraints, and whether the ladder is coordinated with an access hatch.<\/p>\n<p>See the full <a href=\"https:\/\/surespancovers.com\/us\/product-category\/ladders\/\">access ladder range<\/a> and the <a href=\"https:\/\/surespancovers.com\/us\/resource-centre\/ladder-resources\/\">ladder resources<\/a>. To ask for a coordinated ladder, or ladder and hatch, use the <a href=\"https:\/\/surespancovers.com\/us\/contact-us\/\">Surespan contact page<\/a>.<\/p>\n<h2>Sources<\/h2>\n<ul>\n<li>Surespan data sheet &#8220;ZIP8 Retractable Ladder&#8221; (ZIP8), REV 1.0, April 2021: material, trapdoor, lining, treads, loading, operation, EN14975, operating dimensions. Product page: <a href=\"https:\/\/surespancovers.com\/us\/product\/zip8-retractable-ladders\/\">ZIP8 Retractable Ladders<\/a>.<\/li>\n<li>Surespan data sheet &#8220;ZIP4-7 Retractable Ladder&#8221; (ZIP 4 to ZIP 7), REV 2.0, June 2021: minimum aperture, weights. Product page: <a href=\"https:\/\/surespancovers.com\/us\/product\/zip-retractable-ladders\/\">ZIP Retractable Ladders<\/a>.<\/li>\n<\/ul>\n","protected":false},"excerpt":{"rendered":"<p>What to measure before ordering a commercial retractable (attic) ladder, how floor to ceiling height drives the opening, and the mistakes that delay a quote.<\/p>\n","protected":false},"author":6,"featured_media":30159,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"content-type":"","_ayudawp_aiss_exclude":false,"_ayudawp_aiss_exclude_summary":false,"_ayudawp_aiss_summary":"To measure for a commercial retractable ladder, often called an attic ladder in the US, you need four things: the floor to ceiling height measured to the structure, the length and width of the structural (rough) opening, the depth of the void above the ceiling, and the floor space the ladder swings into when it is pulled down. The ZIP8 data sheet gives two figures for each band of floor to ceiling height: the touch down point, measured on the floor from the casing side, and the operating space, the arc the ladder swings through. A marked-up drawing with the structural opening length and width, the floor to ceiling height and its datum, the void depth, whether the ceiling is suspended and the soffit height, any services in the way, the swing zone constraints, and whether the ladder is coordinated with an access hatch.","_ayudawp_aiss_summary_provider":"extractive","_ayudawp_aiss_summary_hash":"0d9429d67bf590015482c50ca723f9ae2825e660","footnotes":""},"categories":[525],"tags":[],"country":[],"product-supplied":[],"class_list":["post-50036","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-articles"],"acf":[],"publishpress_future_workflow_manual_trigger":{"enabledWorkflows":[]},"_links":{"self":[{"href":"https:\/\/surespancovers.com\/us\/wp-json\/wp\/v2\/posts\/50036","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/surespancovers.com\/us\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/surespancovers.com\/us\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/surespancovers.com\/us\/wp-json\/wp\/v2\/users\/6"}],"replies":[{"embeddable":true,"href":"https:\/\/surespancovers.com\/us\/wp-json\/wp\/v2\/comments?post=50036"}],"version-history":[{"count":0,"href":"https:\/\/surespancovers.com\/us\/wp-json\/wp\/v2\/posts\/50036\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/surespancovers.com\/us\/wp-json\/wp\/v2\/media\/30159"}],"wp:attachment":[{"href":"https:\/\/surespancovers.com\/us\/wp-json\/wp\/v2\/media?parent=50036"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/surespancovers.com\/us\/wp-json\/wp\/v2\/categories?post=50036"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/surespancovers.com\/us\/wp-json\/wp\/v2\/tags?post=50036"},{"taxonomy":"country","embeddable":true,"href":"https:\/\/surespancovers.com\/us\/wp-json\/wp\/v2\/country?post=50036"},{"taxonomy":"product-supplied","embeddable":true,"href":"https:\/\/surespancovers.com\/us\/wp-json\/wp\/v2\/product-supplied?post=50036"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}