Vantage Data Centre, Ireland

The Vantage Data Centre, a key player in data colocation services, needed a dependable roofing solution for its Ireland facility. The priority was secure roof access for maintenance and effective smoke ventilation, all while withstanding the local climate. Surespan’s Exi-Vent units were chosen to meet these needs, delivering a practical and robust solution tailored to the data centre’s requirements.

Surespan supplied custom Exi-Vent roof hatches and smoke vents to enhance safety and performance at the Vantage Data Centre in Ireland.

Advanced roof hatch and smoke vent solution

Introduction

The Vantage Data Centre, a leading provider of data colocation services, required a robust roofing solution for its Ireland facility. The solution needed to offer secure roof access for maintenance, effective smoke ventilation, and resilience against Ireland’s weather conditions. Surespan’s Exi-Vent units were selected to meet these demands, delivering a tailored, high-performance solution designed specifically for the data centre’s needs.

About Surespan

With decades of experience, Surespan specialises in high-quality, custom access solutions for projects worldwide. Visit our website or contact our team for more information.

Products Supplied

Surespan provided multiple Exi-Vent units, each crafted from Grade 316L stainless steel for superior durability and corrosion resistance. The units were customised to fit various roof openings, with sizes including 2600 x 1050 mm, 2450 x 1050 mm, and a larger 5660 x 2450 mm unit for key access points.

Key features include:

  • Compliance: CE marked and fully compliant with EN12101-2 standards for smoke and heat exhaust systems.
  • Access and Ventilation:
    • Access hatches open to 85 degrees for safe maintenance access.
    • Smoke vents open to 140 degrees for rapid smoke extraction during emergencies.
  • Weatherproofing: A 210 mm wide fixed central rain channel ensures effective water management, protecting the facility from leaks.
  • Insulation: All units are insulated with mineral wool (MW) to enhance energy efficiency by reducing heat loss.
  • Emergency Access: A manual hand pump provides backup access in case of power failure, ensuring reliability in critical situations.

These features were tailored to the data centre’s specific requirements, ensuring seamless integration with the roofing system and long-term performance.

Project Process and Innovation

Surespan worked closely with the Vantage team throughout the project to deliver a solution that met exact specifications. The process included:

  • Approval Drawings: Detailed designs were provided for client review and approval before manufacturing began.
  • Quality Checks: Rigorous inspections were conducted during manufacturing, with Surespan’s team overseeing each stage to ensure the highest standards.
  • Progress Updates: The client received regular updates, including photos and videos, to monitor the manufacturing process.
  • Site Visits: Surespan conducted on-site assessments to ensure proper installation and integration with the roofing system.
  • After-Sales Support: Ongoing assistance was provided post-installation, including training on the manual hand pump and maintenance guidance.

This comprehensive approach ensured the Exi-Vent units were delivered to the highest quality, with transparency and collaboration at every step.

Conclusion

The Exi-Vent units have enhanced the Vantage Data Centre’s infrastructure, providing secure access, effective smoke ventilation, and long-term durability with minimal maintenance. The insulated design supports energy efficiency, while the robust construction ensures resilience against harsh weather. For roofing professionals, this solution offers a practical, reliable, and compliant choice for critical facilities like data centres.

South Clyde Energy Centre

Surespan supplied a bespoke hydraulically operated double-leaf access cover package for the South Clyde Energy Centre, a major Energy-from-Waste facility under construction in Glasgow.

Centenario Ratones Lithium Plant

Project snapshot Project: Centenario Ratones Lithium Production Plant Location: Salar Centenario Ratones, Department of Los Andes, Salta Province, Argentina (3,800m above sea level) Client: Eramine Sudamérica S.A. (subsidiary of Eramet Group, France / Tsingshan, China) Delivery model: Direct supply, Ex Works. Client arranged logistics to Argentina. Scope: 2no. SRHE/50/DL electrically operated double-leaf roof access hatches (5000 x 5500mm structural opening), with electrical control boxes, battery back-up, key switch controls, painted finish, removable lifting eyes, spare actuators, and 5 days supervisory installation attendance. The project The Centenario Ratones plant is one of the most significant lithium projects in South America. Operated by Eramine Sudamérica S.A. — a joint venture between French mining group Eramet (50.1%) and Chinese steelmaker Tsingshan (49.9%) — the plant uses advanced Direct Lithium Extraction (DLE) technology to produce 24,000 tonnes of battery-grade lithium carbonate per year from brine pumped from beneath the salt flat. Representing an investment