RE, SL, WL, T and B are the performance classes that EN 12101-2, the European product standard for natural smoke and heat exhaust ventilators, uses to describe a roof smoke vent. RE is the reliability class, SL the snow load class, WL the wind load class, T the low ambient temperature class and B the resistance to heat class. Read together, they tell you the performance the vent was declared for. They are European declarations, not a US listing: the US product standard for automatically operated roof vents for smoke and heat is UL 793, and one does not stand in for the other.
This guide is for US architects, specifiers and fire protection engineers who receive a European smoke vent data sheet and need to read its class line. It does not cover when a building needs smoke and heat vents or how many.
What does EN 12101-2 cover, and what does it leave out?
EN 12101-2 is a product performance standard for the ventilator itself. It is used to declare characteristics such as reliability, resistance to environmental loads and temperature capability. Controls, power supplies and other system components are dealt with in other parts of the EN 12101 series. That is why “which control panel do we need?” is a separate question from the vent’s class line.
For a US project, that has two consequences. First, a vent that declares a good set of classes has still only told you about the vent: the control panel, the battery backup and the fire alarm interface need their own specification. Second, the class line is evidence under a European standard. Whether a project needs a listed vent, and to which standard, is for the fire protection engineer and the authority having jurisdiction to settle before a European vent goes on the drawings.
What do RE, SL, WL, T and B mean?
Code |
What it relates to |
What to settle on the project |
Common pitfall |
|---|---|---|---|
RE |
Reliability of the opening function in a fire |
Is the vent for smoke only, or will it also open for everyday ventilation? |
Assuming the fire reliability class also covers heavy daily use |
SL |
Snow load class |
The roof snow load in that roof zone, from the structural engineer |
Leaving SL open until submittal review, then needing a different product |
WL |
Wind load class |
The wind exposure and roof zone assumptions, from the structural engineer |
Scheduling the vent before wind exposure and restraint are agreed |
T |
Low ambient temperature class |
The project climate and how exposed the roof is |
Overlooking the temperature class until commissioning or the first winter service call |
B |
Resistance to heat class |
What the fire strategy expects of the vent under heat exposure |
Assuming every smoke vent has the same B class without checking |
The letters are only half of each class. The figure after the letter is the declared class, and it is the figure you compare with the project’s needs.
What does a Surespan data sheet declare?
The 2018 data sheet for the SRHP/AOV solid lid smoke vent with access prints its EN12101-2 class set: snow load SL500, low ambient temperature T (-15°), wind load WL1500 and resistance to heat B300. The same sheet adds a limit in a footnote: these values are for the SRHP/AOV only, and other models may differ.
The newer sheets for the smoke vent with access (SRH-PAOV), the custom smoke vent (SRH-AOV), the glazed smoke vent (SRHG-AOV), the Exi-Vent roof hatch (SV-EXI) and the dome smoke vent (SDP-MD-50) state that the vent is CE marked to EN12101-2, but they do not print a class set. For any of these, ask for the declared classes of the exact model and size in writing, together with the Declaration of Performance. A class line copied from a sister product is not evidence for the one you are buying.
RE: fire reliability is not everyday ventilation
RE is the reliability classification for the vent’s fire function. Some smoke vents are also opened every day, for purge, airflow or routine access. Surespan’s smoke vent with access is one: its sheet lists daily ventilation and access as a feature. Where a vent will do both jobs, treat them as two declarations. Ask for the declared RE class for the fire function, and separately for evidence of the comfort ventilation cycling the vent is rated for.
Write the use into the schedule: “smoke only” or “smoke and daily ventilation”. Without it, the reliability question tends to surface late, at submittal or commissioning.
SL and WL: match the classes to the roof, not to a guess
Submittals rarely fail because nobody mentioned EN 12101-2. They fail because the declared classes do not match the roof the vent is going on. Three steps avoid that:
- Ask the structural engineer for the snow and wind design basis for the roof zone where each vent sits.
- Write minimum SL and WL classes into the smoke vent schedule, and ask the manufacturer to state, for each declared class, the load it represents in the units your engineer works in. That turns a European class into a number the engineer can check against psf.
- Select a vent that declares those classes in the configuration you will install, including wind deflectors, the opening geometry and any access feature. A class declared for one configuration does not carry over to another.
T and B: climate and the fire strategy
T, low ambient temperature. The T class looks like a small detail and is easy to leave out. On an exposed roof in a cold climate, agree the low-temperature requirement with the design team and put the required T class in the schedule. The SRHP/AOV sheet’s T (-15°) is an example of how the class is printed.
B, resistance to heat. B is the resistance-to-heat classification of the vent. If the fire strategy expects a particular B class, state it in the schedule and ask for matching evidence for the configuration being installed. The SRHP/AOV sheet declares B300.
How do you write the classes into a US smoke vent schedule?
Schedule field |
What to state |
Why it matters |
|---|---|---|
Listing requirement |
Whether the authority having jurisdiction requires a listed vent, and to which standard |
EN 12101-2 classes and CE marking are not a UL 793 listing |
Performance classes |
RE ___ / SL ___ / WL ___ / T ___ / B ___ |
Replaces a yes or no “compliant?” with values that can be checked |
Use |
Smoke only, or smoke and daily ventilation |
Decides which reliability evidence to ask for |
Area |
The required area and whether it is geometric or aerodynamic |
The two can differ markedly for the same vent |
Wind deflectors |
Allowed, required or not permitted |
They are part of the tested configuration where the aerodynamic area is declared with them |
Roof loads |
Snow and wind design basis from the structural engineer, and the roof pitch |
Lets SL and WL be chosen and defended |
Opening and curb |
Rough opening size, curb height limits and the roof build-up |
Stops the declared performance being designed out by the roof detail |
Controls |
Fire alarm interface, local switches and any building automation integration |
Keeps the vent’s classes separate from the control system’s requirements |
Drawings, data sheets and wiring diagrams for each vent are collected in the smoke vent resources, and the full range is under smoke vents.
Frequently asked questions
Is a vent with an EN 12101-2 class set UL 793 listed?
Not because of the class set. EN 12101-2 and UL 793 are separate product standards. A class set declared under EN 12101-2 says nothing about a UL 793 listing, and Surespan’s data sheets do not claim one.
What does SL500 mean on a smoke vent data sheet?
SL is the snow load class under EN 12101-2, and SL500 is the class the sheet declares. Ask the manufacturer for the load it represents in the units your structural engineer uses, and compare it with the roof snow load for that roof zone.
What does WL1500 mean?
WL is the wind load class, and WL1500 is the declared class. Choose the minimum class with the structural engineer from the project’s wind design basis, and make sure the class was declared for the configuration you are installing.
What does B300 mean?
B is the resistance-to-heat class. If the fire strategy names a B class, put it in the schedule and ask for evidence for the exact vent and configuration.
Do all Surespan smoke vents carry the same classes?
Not necessarily. The SRHP/AOV sheet says its classes apply to the SRHP/AOV only and that other models may differ. Ask for the declared classes of each model and size on the schedule.
To ask for the declared classes and the Declaration of Performance for a project, use the Surespan contact page.
Sources
- Surespan data sheet “Smoke Vent SRHPAOV” (SRHP/AOV), revision mark RF REV 3 05/18, May 2018: EN12101-2 classes and the footnote limiting them to the SRHP/AOV. Range: Smoke Vents.
- Surespan data sheet “Thermally Broken AOV” (SRH-PAOV), REV 1.0, June 2022: CE marking to EN12101-2, daily ventilation and access. Product page: Smoke Vent with Access.
- Surespan data sheet “Bespoke Smoke Vent” (SRH-AOV), revision mark REV 1.0 (06/22), file dated October 2026: CE marking to EN12101-2. Product page: Custom Smoke Vent.
- Surespan data sheet “Glazed Smoke Vent” (SRHG-AOV), revision mark REV 1.0 (06/22), file dated October 2026: CE marking to EN12101-2. Product page: Glazed Smoke Vent.
- Surespan data sheet “Bespoke Smoke Vent, Exi-Vent” (SV-EXI), REV 1.0, June 2022: CE marking to EN12101-2. Product page: Exi-Vent Roof Hatch.
- Surespan data sheet “Polycarbonate Dome AOV” (SDP-MD-50), September 2025: CE marking to EN12101-2. Product page: Dome Smoke Vent.
- UL 793, Automatically Operated Roof Vents for Smoke and Heat, Edition 4, shopulstandards.com.