Surespan designs and manufactures thermally broken roof hatches, smoke vents with access supported by documented EN 12101-2 test data, and fire-rated and load-rated floor access doors for data center and colocation projects worldwide. From roof plant decks and chiller yards to switchgear pits, cable trenches and riser zones, we supply secure maintenance access with the drawings, BIM content and technical submittals your design team needs for review and approval.
Data centers need access products that protect the roof envelope, maintain fire-rated construction and stay under the operator’s control. Surespan manufactures roof hatches, smoke vents, floor access doors and fixed access ladders for hyperscale, colocation and enterprise data centers. We work with architects, general contractors and MEP engineers, roofing contractors and operators’ engineering teams on roof plant access, smoke ventilation, switchgear and cable pit covers and riser access, backed by drawings, BIM content and documented test data.
The SRHP75 and SRHP/DL roof hatches combine a thermally broken lid and upstand with an external curb liner for hot- and cold-applied roofing, backed by published third-party water-resistance, weather-sealing and dust-resistance test data, helping keep roof openings over data halls and plant areas weathertight.
Gas spring-assisted opening, hold-open stays, anti-slip finishes and fall-protection options such as safety grids, the SureGuard hatch railing and the Ladder Up Post help maintenance teams reach chillers, condensers and roof plant safely during routine and reactive maintenance.
Smoke vents can be supplied with a 24V control box, smoke detector interface, ventilation switch and fire switch, with emergency battery backup available on the Custom Smoke Vent. Electrically operated floor access doors can be supplied with a control panel, key switches and push buttons. Tell us if the BMS needs an interface and we will confirm what can be supplied.
Roof hatches can be specified with an LO4 padlockable exterior handle or LO6 and LO7 European deadlocks with keyed operation, floor access doors with locking options, and fixed ladders with a padlockable ladder guard that helps prevent unauthorized climbing. Tell us the security requirement and we will confirm the right arrangement.
Where access passes through fire-rated construction, the Fire Rated Roof Hatch and the recessed, flush and heavy duty floor hatches offer fire resistance of up to 4 hours, depending on size and configuration, supported by documented European fire-test data for review against project requirements and the AHJ.
We develop single, double and multi-leaf configurations for large plant openings, lids that sit flush with roof grating, and details for non-standard roof assemblies, supported by coordinated submittal drawings, revision control, QA documentation and lead times confirmed against your schedule.
Match each zone of a data center to the Surespan products normally specified there. Performance statements are those published on each product page and datasheet. Confirm project-specific loading, fire rating, controls and code acceptance with our technical team.
Data center zone | What the project needs | Surespan products |
|---|---|---|
Roof plant decks and chiller yards | Weathertight, thermally broken roof access for routine plant maintenance | Standard Roof Hatch (SRHP75) and Double Leaf Roof Hatch (SRHP/DL) for larger openings and equipment handling. Published third-party water-resistance, weather-sealing and dust-resistance test data. |
Roof-level smoke ventilation | Smoke ventilation and roof access at roof level | Smoke Vent with Access (SRHP-AOV), Exi-Vent Roof Hatch with the smoke vent and access hatch sized independently, Dome Smoke Vent (SDP-MD-50) and Custom Smoke Vent (SRHE-AOV) for larger openings. Documented EN 12101-2 test data; confirm code acceptance with the AHJ. |
Fire-rated plant rooms and risers | Access through fire-rated roof or floor construction | Fire Rated Roof Hatch (SRHTB/FR) and fire-rated floor hatches. Up to 4 hours, depending on configuration, with documented European fire-test data. |
Switchgear pits, cable trenches and service voids | Flush, lockable floor access that matches the surrounding floor finish | |
Plant replacement routes and yards | Traffic-rated floor access doors for wheel or equipment loads | Heavy Duty Floor Hatch (SEHDC), with loading confirmed per project. Our guide What is a Floor Door? lists the loading questions to answer. |
Offices, corridors and support areas | Discreet pedestrian floor access | |
Ladder access to roof hatches | A safe route to the hatch and protection against unauthorized climbing | Fixed Vertical Ladders (SL) with an optional padlockable ladder guard |
Surespan provides the technical information architects, MEP engineers and contractors need to review, approve and install access products on data center projects. Our Resource Center is organized for BIM-led workflows and formal submittals, so project teams can find the right datasheet, drawing or model quickly.
Access datasheets, performance summaries, load classifications, installation guidance, and supporting documentation commonly required on data center projects, including thermally broken roof hatches, flush and recessed access covers, and smoke vents with access.
Download DWG details and BIM models for standard products and typical configurations. Files support efficient integration with roof build-ups, structural openings, access routes, and service zone coordination.
Most data center packages combine thermally broken roof hatches for plant maintenance, smoke vents with access or Exi-Vent roof hatches where roof-level smoke ventilation is required, fire-rated roof hatches where access passes through fire-rated construction, and recessed or flush floor access doors for switchgear pits, cable trenches and service voids. Fixed vertical ladders with a padlockable ladder guard complete the access route. The specification guide on this page shows which product suits each zone.
Yes. The Recessed Floor Hatch (HIAC) takes the surrounding floor finish, such as tile, stone or concrete, so the door blends into the floor, the Flush Floor Hatch (SAC) has a low-profile aluminum tread plate lid, and the Heavy Duty Floor Hatch (SEHDC) suits service trenches, plant areas and vehicle routes. Floor Ducting (FD) gives lift-out access along cable and pipe routes. Floor access doors can be lockable, fire rated and electrically operated. Send us the opening size, loading, fire rating and floor finish and we will recommend the right door.
Data center inquiries frequently require confirmation of a fixed delivery date to match access windows and schedule milestones. As a guide from historic data center orders, some items are supplied from stock (2 to 3 business days), standard manufactured products often fall in the 2 to 6 week range, and larger custom units can extend to 10 to 12 weeks. Once you share sizes, quantities and required controls, we will confirm an achievable schedule-aligned lead time.
Yes, this is a common coordination request on data center roofs. We typically need the grating specification (for example thickness and bearing detail) and the steel support strategy so the lid and frame are fabricated to suit and the hatch bears correctly. If you provide the grating and steelwork details early, we can coordinate the hatch interface and avoid site rework.
We supply the hatch assembly and provide installation guidance, but the supporting structure around the opening remains a key design coordination point. Contractors often ask whether additional steelwork is required to support the frame or to integrate with grating. If you share the structural opening, roof assembly and edge conditions, we will advise the typical structural support requirements and confirm the fixing approach during drawings.
Certification and actuator configuration are frequent technical queries. Our smoke vents are supported by documented EN 12101-2 smoke-vent test data. EN 12101-2 is a European standard, so on North American projects final acceptance should be coordinated with the AHJ, the project fire strategy and the design team. Where a tested smoke vent is required, the actuator arrangement must match the tested configuration that underpins compliance. Concealed actuators are available as an option on the Custom Smoke Vent (SRHE-AOV). For other units we will confirm whether a concealed detail can remain compliant, or recommend an alternative configuration that meets the project’s approval requirements.
Control specification is a common request, particularly where access or smoke ventilation interfaces with site procedures. Smoke vents can be supplied with a 24V control box, smoke detector interface, ventilation switch and fire switch, and the Exi-Vent can add key switch and push button control. Emergency battery backup is available on the Custom Smoke Vent, and electrically operated floor access doors can be supplied with a control panel, key switches and push buttons. Share the operational intent (access only, smoke control interface, BMS integration, local override) and we will recommend an appropriate control set.
Roof hatches can be supplied with an LO4 padlockable exterior handle or LO6 and LO7 European deadlocks with keyed operation, floor access doors can be specified with locking options, and electrically operated units can use key switches so only authorized staff can open them. Fixed vertical ladders can be fitted with a padlockable 6.6 ft (2 m) ladder guard to help prevent unauthorized access. If your project specifies a tested security standard, tell us the standard and class and we will confirm what can be supplied.
Yes. The recessed, flush and heavy duty floor hatches offer fire resistance of up to 4 hours, depending on size and configuration, supported by documented European fire-test data that can be reviewed against North American project requirements and AHJ expectations. Share the required fire rating, loading and floor finish and we will confirm the right door. Our article on fire rating standards for roof hatches in the US explains the European test approach.
The Standard Roof Hatch (SRHP75) and Double Leaf Roof Hatch (SRHP/DL) have a thermally broken lid and upstand, an external curb liner that accepts hot- and cold-applied roofing, and published third-party water-resistance, weather-sealing and dust-resistance test data. Thermal performance depends on the product and insulation, so compare thermal values like for like using each product’s datasheet.
Yes. Data center projects often require formal submittals with clear revision control. We can provide coordinated submittal drawings (PDF and DWG), BIM models and supporting information for consultant review, enabling technical submissions to move through approvals efficiently.
Yes. For Vantage Data Centre in Ireland we supplied custom Grade 316L stainless steel Exi-Vent units, CE marked to EN 12101-2, with access hatches opening to 85 degrees, smoke vents opening to 140 degrees, a 210 mm central rain channel and a manual hand pump for backup access during a power failure. Other data center projects include Virtus LON14, Gyron, Kenley Micro Data Centre, Meta ODN3 and The Chess Building in Watford.